Initial commit

This commit is contained in:
Nick Touran 2025-09-22 14:54:12 -04:00
commit 98edb494ae
55 changed files with 1905 additions and 0 deletions

View file

@ -0,0 +1,87 @@
Engineering Calculation Procedure
*********************************
.. list-table:: Revisions
:widths: 20 80
:header-rows: 1
* - Version
- Change summary
* - 0.1.0
- Initial release
Purpose
=======
Scope
=====
Definitions
===========
Roles & Responsibilities
========================
Originator
----------
Verifier or Checker
-------------------
Responsible Manager
-------------------
Design Authority
----------------
Safety Basis Authority
----------------------
Procedure
=========
General
-------
Determination of Calculation Type
---------------------------------
Use of Engineering Calculation Software
---------------------------------------
Software Management and Quality Assurance
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
Functional Classification of Software
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
Error Control
^^^^^^^^^^^^^
Calculations by Others
----------------------
Registered Professional Engineer
--------------------------------
Release to Outside Agencies
---------------------------
References
==========
Records
=======
Forms
-----
Procedure Basis
===============
The sections in this procedure were informed by Savannah River Conduct of
Engineering Manual E7 Procedure: 2.31 rev 15
https://www.nrc.gov/docs/ML2020/ML20206L028.pdf