Initial commit

This commit is contained in:
Nick Touran 2025-09-22 14:54:12 -04:00
commit 98edb494ae
55 changed files with 1905 additions and 0 deletions

View file

@ -0,0 +1,48 @@
10 CFR 50
=========
.. req:: Abide by 10 CFR 50
:id: R_10CFR50
.. :basis: Promulgated by the Nuclear Regulatory Commission pursuant to the
Atomic Energy Act of 1954, as amended (68 Stat. 919), and Title II of the
Energy Reorganization Act of 1974 (88 Stat. 1242), to provide for the
licensing of production and utilization facilities
Appendix A
----------
`10 CFR 50 Appendix A
<https://www.nrc.gov/reading-rm/doc-collections/cfr/part050/part050-appa.html>`_
contains the General Design Criteria for nuclear power plants, often considered
primarily for LWRs. For non-LWRs, you may want to bring in RG 1.232, which
describes the development of PDCs for non-LWRs.
See `NRC summary of non-LWR Design Criteria <https://www.nrc.gov/reactors/new-reactors/advanced/modernizing/rulemaking-and-guidance/nrc-doe-joint-initiative-non-lwr-design-criteria.html>`_
and `RG 1.232 <https://www.nrc.gov/docs/ML1732/ML17325A611.pdf>`_.
.. needtable:: Appendix A summary
:filter: id.startswith("R_GDC")
:columns: id
.. include:: /../generated_assets/10-cfr-50-app-a-list.rst
Appendix B
----------
.. req:: Abide by 10 CFR 50 App B
:id: R_10CFR50_APPB
:links: R_10CFR50
:collapse: true
`10 CFR 50 Appendix B
<https://www.nrc.gov/reading-rm/doc-collections/cfr/part050/part050-appb.html>`_
describes the quality assurance criteria for nuclear plants and fuel
reprocessing plants.
.. :basis: Flowed down
.. needimport:: /../generated_assets/10-cfr-50-app-b.json
:collapse: true
:tags: ["quality"]