Some AMS specific stuff, and plant work

This commit is contained in:
Nick Touran 2025-12-01 17:04:45 -05:00
parent 9332337581
commit e474c140ee
30 changed files with 558 additions and 21 deletions

View file

@ -12,7 +12,8 @@ bases.
:caption: Contents:
:glob:
stakeholder/index
stakeholder/ams
national/index
industry/*
standards/index
*

View file

@ -0,0 +1,26 @@
EPRI ALWR
=========
This page contains some high-level requirements sourced from the EPRI Advanced
Light Water Reactor Utility Requirements Document :cite:p:`mprAdvancedLightWater99a`
.. req:: Passive ALWRs shall not require safety-related AC electric power other than
inverter supplied AC power for I&C.
:id: R_ALWR_1
.. req:: 72-hours without manual operator action.
:id: R_ALWR_2
For transients and accidents analyzed under the initiating event plus
single failure Licensing Design Basis assumptions (which include loss of all ac
power), no credit for manual operator action shall be necessary to meet core
protection regulatory limits for at least 72 hours following initial indication
of the need for action (i.e., approximately the time of the initiating event).
.. req:: Only simple actions and assistance shall be necessary beyond 72 hours
:id: R_ALWR_3
.. req:: Off-site dose limits shall be maintained for at least 72 hours without
the need for off-site assistance.
:id: R_ALWR_4

View file

@ -0,0 +1,77 @@
AMS Stakeholder Requirements
============================
The following requirements come from the Project Leaders at AMS.
.. req:: Develop a new nuclear maritime industry.
:id: R_PROJ_1959
.. req:: The first vessel shall have an electrical power output range of 750 kWe -- 16 MWe.
:id: R_AMS_1
:links: R_PROJ_1959
:basis: Appropriate for commercial demonstrator, per Axioms
:cite:p:`cahillDesignPhilosophyBrief2025`
.. req:: The electrical backbone shall operate at 6.6 kVAC at 60 Hz
:id: R_AMS_2
:links: R_PROJ_1959
:basis: Maximum commercial compatibility, per Axioms
:cite:p:`cahillDesignPhilosophyBrief2025`
.. req:: The demonstrator vessel shall be in the water by the Summer of 2030.
:id: R_AMS_3
:links: R_PROJ_1959
:basis: Desire to move fast, per Axioms
:cite:p:`cahillDesignPhilosophyBrief2025`
.. req:: The demonstrator vessel shall be flagged to US standards.
:id: R_AMS_4
:links: R_PROJ_1959
:basis: Per Axioms
:cite:p:`cahillDesignPhilosophyBrief2025`
.. req:: The demonstrator vessel architecture shall be grounded in IMO Resolution A.491(XII)
:id: R_AMS_5
:links: R_PROJ_1959
:basis: Per Axioms document
Document reference: :cite:p:`imoCodeSafetyNuclear1982`.
Source :cite:p:`cahillDesignPhilosophyBrief2025`.
.. req:: The demonstrator vessel shall facilitate future augmentation of the power system
without massive amounts of construction.
:id: R_AMS_6
:links: R_PROJ_1959
:basis: Desire for drop-in nuclear-readiness, per Axioms
:cite:p:`cahillDesignPhilosophyBrief2025`
.. req:: The reactor system shall comply with Passive Plant safety requirements defined in EPRI ALWR URD
:id: R_AMS_7
:basis: This satisfies modern customer expectations of safety
:links: R_PROJ_1959, R_ALWR_1, R_ALWR_2, R_ALWR_3, R_ALWR_4
The EPRI ALWR URD is :cite:p:`mprAdvancedLightWater99a`
.. req:: The vessel shall have a double bottom for the full length of the ship
:basis: USCG per 3.1.2.2 of CNSG status
.. req:: The vessel shall have two compartment subdivision
:basis: USGC and AMS rules, per 3.1.2.2 and 3.1.2.3 of CNSG status
.. needflow:: Engineering plan to develop a nuke on a ship
:alt: Engineering plan
:root_id: R_PROJ_1959
:config: lefttoright
:show_link_names:
:border_color:
[status == 'open']:FF0000,
[status == 'in progress']:0000FF,
[status == 'closed']:00FF00