AMS Stakeholder Requirements
============================
The following requirements come from the Project Leaders at AMS.
.. req:: Develop a new nuclear maritime industry.
:id: R_PROJ_1959
.. req:: The first vessel shall have an electrical power output range of 750 kWe -- 16 MWe.
:id: R_AMS_1
:links: R_PROJ_1959
:basis: Appropriate for commercial demonstrator, per Axioms
:cite:p:`cahillDesignPhilosophyBrief2025`
.. req:: The electrical backbone shall operate at 6.6 kVAC at 60 Hz
:id: R_AMS_2
:links: R_PROJ_1959
:basis: Maximum commercial compatibility, per Axioms
:cite:p:`cahillDesignPhilosophyBrief2025`
.. req:: The demonstrator vessel shall be in the water by the Summer of 2030.
:id: R_AMS_3
:links: R_PROJ_1959
:basis: Desire to move fast, per Axioms
:cite:p:`cahillDesignPhilosophyBrief2025`
.. req:: The demonstrator vessel shall be flagged to US standards.
:id: R_AMS_4
:links: R_PROJ_1959
:basis: Per Axioms
:cite:p:`cahillDesignPhilosophyBrief2025`
.. req:: The demonstrator vessel architecture shall be grounded in IMO Resolution A.491(XII)
:id: R_AMS_5
:links: R_PROJ_1959
:basis: Per Axioms document
Document reference: :cite:p:`imoCodeSafetyNuclear1982`.
Source :cite:p:`cahillDesignPhilosophyBrief2025`.
.. req:: The demonstrator vessel shall facilitate future augmentation of the power system
without massive amounts of construction.
:id: R_AMS_6
:links: R_PROJ_1959
:basis: Desire for drop-in nuclear-readiness, per Axioms
:cite:p:`cahillDesignPhilosophyBrief2025`
.. req:: The reactor system shall comply with Passive Plant safety requirements defined in EPRI ALWR URD
:id: R_AMS_7
:basis: This satisfies modern customer expectations of safety
:links: R_PROJ_1959, R_ALWR_1, R_ALWR_2, R_ALWR_3, R_ALWR_4
The EPRI ALWR URD is :cite:p:`mprAdvancedLightWater99a`
.. req:: The vessel shall have a double bottom for the full length of the ship
:basis: USCG per 3.1.2.2 of CNSG status
.. req:: The vessel shall have two compartment subdivision
:basis: USGC and AMS rules, per 3.1.2.2 and 3.1.2.3 of CNSG status
.. needflow:: Engineering plan to develop a nuke on a ship
:alt: Engineering plan
:root_id: R_PROJ_1959
:config: lefttoright
:show_link_names:
:border_color:
[status == 'open']:FF0000,
[status == 'in progress']:0000FF,
[status == 'closed']:00FF00