# Data regarding the various project the company is working on. # The abbreviations drive document/record numbering projects: - name: Training and Test Platform abbrev: TTP description: > The FOAK AMS nuclear ship, owned and operated by AMS and used for training and testing. Effectively it produces the information validating the commercial readiness of higher-powered ships. It's intended to be of the same design as the commercial power plant, but may be downrated e.g. from 50 MWe to 10 MWe. - name: Integration Shipyard abbrev: ISH description: > The shipyard that integrates nuclear power plants into pre-built ships. - name: Nuclear Ready abbrev: NRDY description: > Standard interfacing information that defines how to make a ship that can easily be outfitted with a nuclear power system at the Integration Shipyard.