AMS: adjust schedule format

Add projects, add MDDL
This commit is contained in:
Nick Touran 2025-12-29 12:12:38 -05:00
parent f13e1e2ee2
commit f7ee72a66b
4 changed files with 262 additions and 135 deletions

View file

@ -0,0 +1,20 @@
# Data regarding the various project the company is working on.
# The abbreviations drive document/record numbering
projects:
- name: Training and Test Platform
abbrev: TTP
description: >
The FOAK AMS nuclear ship, owned and operated by AMS and used for training and testing.
Effectively it produces the information validating the commercial readiness of
higher-powered ships. It's intended to be of the same design as the commercial
power plant, but may be downrated e.g. from 50 MWe to 10 MWe.
- name: Integration Shipyard
abbrev: ISH
description: >
The shipyard that integrates nuclear power plants into pre-built ships.
- name: Nuclear Ready
abbrev: NRDY
description: >
Standard interfacing information that defines how to make a ship that can
easily be outfitted with a nuclear power system at the Integration
Shipyard.